People in general know that the bathroom needs waterproofing. In order to avoid the occurrence of water leakage, waterproof work must be done well. Waterproofing is low, and it is easy to seep. It is not necessary to do too much . , Follow Xiaobian to learn about it!
First, how high the bathroom waterproof
1, the bathroom waterproof can be divided into waterproof and wall surface waterproof, according to the conventional bathroom waterproof layer can not be lower than the minimum 300mm, the height of the wall by the shower head can not be less than 1800mm thickness must not be less than 1.5mm, or a long time Bathing is easy to seep into the adjoining room. In order to avoid late troubles, we must not save material. After the completion of the waterproofing project, a full 24-hour water storage experiment is performed.
2. How high is the bathroom waterproof ? General non-shower bathroom waterproof to do 1500mm is also possible, but in order to strengthen the waterproof, but some people unified to achieve 1800mm, although the cost will increase, but it will be more insurance, if it is close to the bedroom, it is recommended to do directly to do full height .
3. Rain showers at home are generally installed at a height of 1800mm. If we look at the height of our adults, if the bathroom's waterproofing is not high enough, it will easily lead to mildew in the walls. Long-term spraying will cause Loss of waterproof function. Therefore, the waterproof height of the shower area of ​​the bathroom must be higher than 1800mm.
Second, bathroom waterproof precautions
1. Whether it is the initial installation or reconstruction, the bathroom must be cleaned and the floor leveled with cement mortar before it can be waterproofed. This is to avoid inhomogeneous coating and cause water seepage.
2, during the construction of waterproof layer, due to waterproof, fire prevention, there are soft-soled shoes, to avoid damage to the ground.
3, in the joints of the waterproof work, we must pay more special attention, more brushing several times.
4, waterproof coating is to brush three times, and each brushing is required to dry out again to brush. But there are times when it is sunny. If Xiao Bian recommends it, try to stagger the spring decoration as much as spring rains, waterproof materials are not easy to dry, will have an impact on the construction effect. If you really need to decorate in the spring, you must choose sunny days to paint waterproof material.
5. After the toilets are fully drained, we still need to do a waterproof test. The height of the water injection needs to be about 10cm. If after 24 hours, there is no leakage of water from the wall or the ground, it will prove that the waterproof is done. Now. On the contrary, it is necessary to find leakage points in time to make leaks.
It is most appropriate to do the toilet waterproofing . Xiao Bian has shared it here and I hope to help you. If you need to learn more about the decoration, building materials, home, you can pay attention to this site, more information waiting to share with you oh.
Bathroom waterproof bathroom waterproof how to do toilet waterproof practice bathroom waterproof specification bathroom waterproof to do more
Gas Fastening System is a very popular and very efficient building Fastening System which include gas tool, fuel cell and strip fasteners. Gas tool absorbs flammable gas from fuel cell and mixes it in its air cylinder. The mixture is ignited by electric device and produce a lot of high pressure gas which push the piston go forward to push the strip fastener into the concrete or wood basement. Compared with General Purpose Powder Actuated Fastening System, it is much more quicker and efficient. But it is not used for very hard basement for its highest power energy is no more than 110 Joules.
Gas tool:
Fuel Cell:
Strip Fasteners:
The packages are as the following:
1.Gas tool and its spare parts will be packed by a plastic box with a carton;
2.10 Fuel Cells are packed by 1paper box, 12 boxes are packed by one carton.
3. 1000 strip fasteners are packed by 1 paper box, 5 or ten 10 paper boxes are packed by one carton.
Gas Fastening System
Gas Fastening System,Gas Nail,Gas Actuated Tool,Gas Fastening
Yibin Heheng Technology Co.,Ltd , https://www.chinadirectfastening.com