In summer, it is often the off-season home improvement, but as consumers have reasonable understanding of home improvement, summer decoration is not a small number of friends, summer is often more rain, where the water to pay special attention to the decoration.
Three male Aurora    House home flagship store
Recently, there were a few complaints about the quality of home improvement projects. These problems were caused by unreasonable construction during summer decoration.
Coatings: Many problems with wall locks
In less than a year, Mr. Lu has been painting the walls for the third time. In May last year, Mr. Lu rushed to work due to catching up with the renovation of a new house. During the plum rainy days, the wall was plastered in two days. As a result, in less than three months, the wall began to crack and crack. Efforts were made to contact the original workers for repairs. Unexpectedly, two months ago, Mr. Lu’s ceiling actually fell off a piece of paint.
What happened to the wall? Design Director Chen Wei analyzed that Mr. Lu's home wall construction is in the summer, hot summer weather, visual and feel of the "dry" is actually an illusion, and Mr. Lu home deadline, putty and paint are not Drying on the next step of painting, this will lock in too much water in it, the wall will appear "sweat", drums, mildew, cracking over time.
Chen Wei also reminded consumers that the paint is easy to evaporate. Workers must shave the putty thin, add more cellulose, and have a large elasticity. The tensile effect is good. When the wall is brushed, the paint must be adjusted to “lean†and have a large amount of moisture. To ensure that the wall does not crack. At the same time, we should also do a good job in the drying of the primary coating and try to prolong the drying time. I should dry the paint three or four days later. Do not paint on rainy days. It is best to brush it again on the third day after the rain is fine.
Tiles: Difficult repair of large area empty drums
Ms. Wang, who was renovating, called the reporter very annoyed. She said: “After the tiles were laid, I knocked and found that the kitchen tiles were emptying in a large area and asked the foreman to knock down the resurfacing. I didn’t expect the foreman to say that Now is the season of renovation. There are a lot of bricklayers. Let me wait a few days and this will be no sound, and the telephone will not work."
Tiles are well-laid, and it is found that the emptying is serious. It takes a lot of time and effort to repair and rework. This is a lot of decoration problems that the owners have encountered. “The brickworkers and painters are the ones most affected by the hot weather.†Zhang Dianrui, the chief designer of the design center, said that because the water loss in the summer is quicker and the cement is more likely to harden, it is necessary to extend the treatment of the water before paving the floor tiles and wall tiles. Time, to make it fully close to saturation, and at the same time can not let the veneer bottom is too dry, the general treatment should be poured before the water, let it absorb for half an hour or so, then use cement mortar to ensure a firm stick to avoid empty , shedding phenomenon.
In addition, when paving large tiles of sizes of 0.8m×0.8m, 1m×1m, summer construction should pay attention to reserve sufficient expansion joints to ensure contraction. If the tiles do not have special process requirements, follow the traditional method. It should be noted that in the pavement after the bottom mortar in the tap exhaust, check the consistency of the density, such as the occurrence of partial loose, add the mortar again beat the exhaust, and then coated with pure cement slurry on the back of the brick to knock off, complete Paving. Zhang Dianrui also specifically reminded that if the owner is to hire guerrilla workers to paste, it is best to supervise the construction process on the spot, otherwise it is easy to cause empty tiles, to install hoods, water heaters, etc., bring great trouble, and once the air Drum phenomenon is difficult to repair.
Construction acceptance entrance decoration children's room decoration paint paint decoration design home improvement cement kitchen wall tiles home decoration home tile specification kitchen tile home decoration ld tile
If you want nothing short of the best in Komatsu Hydraulic Parts, then brand-new genuine OEM Komatsu parts deserve strong consideration. Brand-new parts will deliver long-lasting performance and extend the time between replacements. The latest Caterpillar Main Hydraulic Pump also feature the most advanced technology available from the global heavy equipment leader, which can increase your excavator`s productivity and reduce your long-term ownership costs. Genuine OEM parts can provide much better quality than those aftermarket products offered by many suppliers. We carry a full line of General Duty parts as well as Heavy Duty Excavator Parts.
Hydraulic Piston Pump, Duplex Pump, Short-Stroke Pump, Noise/Vibration Reduction, High Self-Priming Ability, Rotational Stability, High Efficiency, High Pressure, Compact Size, Reduction of Overall Length.
Komatsu Hydraulic Main Pump,Komatsu Main Hydraulic Pump,Komatsu Hydraulic Pump,Komatsu Hydraulic Pump Spare Parts,Komatsu Hydraulic Main Pump Assembly,Komatsu Main Pump,Komatsu Pump,Komatsu Hydraulic Parts,Komatsu Excavator Parts.
Komatsu Hydraulic Pump Spare Parts
HPV35,HPV71,HPV75,HPV90,HPV95,HPV100,HPV132,HPV140,HPV160,HPV165,KPV90,KPV105,KPV90,KPV90,KMF41,KMF125
Komatsu Hydraulic Main Pump,Komatsu Main Hydraulic Pump,Komatsu Hydraulic Pump,Komatsu Hydraulic Pump Spare Parts,Komatsu Hydraulic Main Pump Assembly,Komatsu Main Pump,Komatsu Pump,Komatsu Hydraulic Parts,Komatsu Excavator Parts
Jining Juheng Hydraulic Machinery Co., Ltd. , https://www.sdjuhengmachine.com