Hydro-electricity pre-installation is the most important construction technology in the renovation of a new house. Reasonable hydropower line reconstruction and layout is a kind of protection for the occupants' personal safety, so as to avoid unnecessary disasters. Therefore, in the decoration, it is best to install a professional team of hydropower to install. Today, Xiao Bian wants to give everyone knowledge of Kopu's pre-installation and hopes to help everyone.
Hydropower installation knowledge
The general height of the installation switch socket is:
1, the power switch is generally 120cm to 135cm high from the ground (usually the switch height is as high as the shoulder of an adult)
2. Wall sockets for audio-visual equipment, desk lamps, wiring boards, etc. are generally 30 to 40 cm high from the ground (the living room outlets may be based on TV cabinets and sofas).
3. The socket of the washing machine is 120 cm to 150 cm high from the ground, and the outlet of the refrigerator is 60 cm to 90 cm high.
4. Hangers for hanging air conditioners, exhaust fans, etc. are 190 cm to 200 cm high from the ground;
5, kitchen function socket 110 to 120 cm high from the ground
6. Hangers for hanging air conditioners, exhaust fans, etc. are 190 cm to 200 cm high from the ground;
Hydropower pre-installation precautions
(A) The bedroom ceiling light can be considered double control (bedside and entrance);
(2) According to the needs of living, the ceiling light of the living room can be considered to be equipped with sub-control switches (into the entrance hall and back to the main bedroom door);
(3) Observe whether there are modules in the telephone sockets and network cable sockets;
(d) The surround sound line should be buried when the circuit is modified.
(e) Note that strong and weak wires cannot be in the same pipe and there will be interference;
(6) If the living room, the kitchen and the bathroom are tiled, some locations may be properly considered without slotting;
(7) The socket is generally 30CM away from the ground, not less than 20CM, and the switch is generally 130CM away from the ground;
(h) The exhaust fan switch and telephone socket shall be installed near the toilet instead of the wall of the bathroom door;
(9) The Yuba should be considered to be installed near the shower room or bath instead of being placed in the center of the bathroom;
(10) Reservations for sockets may be considered for balconies, corridors, and cloakrooms;
(11) Spaces with mirrors and coat hooks should consider lighting near the mirror;
(12) In the living room, master bedroom, and bathroom, telephone lines should be pre-set according to personal habits and convenience;
(xiii) Up to eight lines in a single tube, and remember that each tube gap cannot be less than 40%.
(14) How to charge the cassette must be stated in advance. This is the most hidden and darkest profit point for the transformation of the water circuit. A cassette market is also one or two dollars, while the decoration team often charges more than ten dollars, and the average home improvement needs a small number of cassettes to be five or sixty. Therefore, it is normal for students to throw a few hundred dollars for this.
(15) The location of the socket is very important, and often the socket is just behind the bedside cabinet, causing the cabinet to fail against the wall. It is generally not wrong to let the outlet be as close as possible, but if you leave the location of the outlet improperly, it may conflict with the placement of the furniture or the installation of the electrical appliance in the later period. Students must remember;
(16) Some kitchen sockets are also convenient with switches to avoid the inconvenience of pulling and unplugging the rice cooker plugs from time to time, for example.
(17) There is no need to set too many sockets behind the TV. It is better to put a patch panel on the side of the TV afterwards.
(18) In the electrical code, it is required that buried pipe must be made of PVC pipe and turned head.
(19) The circuit modification is necessary to increase the line capacity in consideration of the use of household appliances;
(XX) Clear communication intentions and design ideas with workers. And on the wall bullets painted actual circuit transformation route.
The above is an introduction to the knowledge of the installation of hydropower and I hope to help you. For more information on hydropower, please continue to pay attention to this site information.
Hydropower installation Nanning Hydropower decoration design spring decoration knowledge decoration materials knowledge autumn decoration knowledge
1.5 inch / 125 mm Heavy duty caster wheel
2.High quality galvanized support
3.Single wheel PU/ Nylon/ PVC / TPR material
4.Double ball bearing, easy to operate and durable
Caster Wheel Heavy Duty,5 Inch Heavy Duty Casters,Hardware Wheels Casters,5 Inch Pvc Caster
Yangjiang Xingyang Industry & Trade Co.,Ltd. , https://www.xycaster.com