Project Overview:
This project has two rooms, two rooms and one bathroom. The building area is 37 square meters and the height of the building is 2.8 meters.
Acceptance conclusion:
one. The project's decorative surface layers were hollowed and cracked at various locations (see the drawing of the entrustment sheet 3589(11)). The acceptance was unqualified.
Based on: Standard 9.0.2 putty should use putty with water resistance, putty and matrix combined with solid, strong, can not afford skin, no powder, no cracks.
two. One hall door and door frame paint have brush lines and flow drops (see the sketch chart of entrusted orders (12)). The acceptance is unqualified.
According to: Standard 9.0.3 The paint surface should be smooth, smooth, no brushing, peeling and spots, clear varnish wood grain, no wraps on the large surface, falling and wrinkled skin, basically the same color, no brush pattern. Hardware and glass are clean.
three. The hollowing rate of one floor tile was 20.8%, the emptying rate of two floor tiles was 12.5%, and the emptying rate of bathroom wall tiles was 5.98% (see sketch map 210(13)). The acceptance was unqualified.
Based on: Standards 8.1.4 Wall tiles shall be flat and firm, with clear patterns, no dirt product, no grime marks, the same color on the surface, even joints, no cracks, missing corners, and lack of edges on the plates. The rate must not exceed 5% of the quantity.
four. The unlined wall power line pipe is directly buried in the plastering layer and the joint at the top of the power line is not in the connection box (see the schematic diagram of the order sheet 7). The acceptance is unqualified.
According to: Standard 3.0.2 electrical wiring should be used dark pipe laying, the wire should not have knots and kinks in the pipe, wire from the telephone line, closed-circuit television line shall not be less than 50 centimeters, there must be no exposed conductor inside the ceiling, is strictly prohibited Directly buried in the plaster layer.
Fives. The water supply pipe is not fixed and the pipe is bent (see the sketch chart of the order 6). The acceptance is unqualified.
According to the standard 2.0.2 pipeline installation should be straight and straight, laying firm, slope meets the requirements, valves, faucets installed flat, easy to use, clear tube anti-rust coating, dark pipe brush anti-corrosion paint.
six. Toilet toilet, there are traces of water leakage around the outlet (see the power of attorney list 1) due to water-free sources, can not do water test (fixed after the results of the water source to be determined).
reporter:
Client's telephone number:
The project acceptance unit:
Project acceptance and inspection personnel:
Client:
Supervisors:
Engineering acceptance address:
Acceptance criteria for project completion: Beijing Standard "Quality Acceptance Criteria for Family Home Decoration Projects" DBJ/T01-43-2000
Project Overview:
This project has two rooms, two rooms and one bathroom. The building area is 37 square meters and the height of the building is 2.8 meters.
Acceptance conclusion:
one. The project's decorative surface layers were hollowed and cracked at various locations (see the drawing of the entrustment sheet 3589(11)). The acceptance was unqualified.
Based on: Standard 9.0.2 putty should use putty with water resistance, putty and matrix combined with solid, strong, can not afford skin, no powder, no cracks.
two. One hall door and door frame paint have brush lines and flow drops (see the sketch chart of entrusted orders (12)). The acceptance is unqualified.
According to: Standard 9.0.3 The paint surface should be smooth, smooth, no brushing, peeling and spots, clear varnish wood grain, no wraps on the large surface, falling and wrinkled skin, basically the same color, no brush pattern. Hardware and glass are clean.
three. The hollowing rate of one floor tile was 20.8%, the emptying rate of two floor tiles was 12.5%, and the emptying rate of bathroom wall tiles was 5.98% (see sketch map 210(13)). The acceptance was unqualified.
Based on: Standards 8.1.4 Wall tiles shall be flat and firm, with clear patterns, no dirt product, no grime marks, the same color on the surface, even joints, no cracks, missing corners, and lack of edges on the plates. The rate must not exceed 5% of the quantity.
four. The unlined wall power line pipe is directly buried in the plastering layer and the joint at the top of the power line is not in the connection box (see the schematic diagram of the order sheet 7). The acceptance is unqualified.
According to: Standard 3.0.2 electrical wiring should be used dark pipe laying, the wire should not have knots and kinks in the pipe, wire from the telephone line, closed-circuit television line shall not be less than 50 centimeters, there must be no exposed conductor inside the ceiling, is strictly prohibited Directly buried in the plaster layer.
Fives. The water supply pipe is not fixed and the pipe is bent (see the sketch chart of the order 6). The acceptance is unqualified.
According to the standard 2.0.2 pipeline installation should be straight and straight, laying firm, slope meets the requirements, valves, faucets installed flat, easy to use, clear tube anti-rust coating, dark pipe brush anti-corrosion paint.
six. Toilet toilet, there are traces of water leakage around the outlet (see the power of attorney list 1) due to water-free sources, can not do water test (fixed after the results of the water source to be determined).
reporter:
Construction Acceptance Paint Decoration TV Decoration Glass Home Improvement Glass Brick Glass Door Bathroom Wall Tile Bathroom Ceiling Bathroom Floor Tiles Bathroom Doors
Main functions:
Rear wash, feminine wash, massage wash, kid wash, Seat heating, warm air drying, Soft close, seat sensor, night light, Water temp adjust, air temp adjust, seat temp adjust, nozzle adjust, Instant water heating, IPX4 water proof, Side control panel, remote control, Energy saving mode
Extra functions:
automatic open/ close, automatic flushing, with Super flushing system by own research and development
Intelligent Items,Smart Cover,Automatic Toilet,Intelligent Bidet
XIAMEN JIEENTE IMPORT AND EXPORT CO.,LTD , https://www.xiamenjieente.com