Difu's 46-inch LCD splicing screen is the main push, and has always been favored by everyone. 46-inch large-screen splicing for better color saturation, the product's professionally developed color calibration technology can achieve 92% high color saturation of the splicing wall. This technology can be used to color-calibrate still and dynamic images to ensure picture output. Precise and stable. 
The large screen splicing screen has uniform brightness and the image is stable and not flickering: since each point of the LCD screen maintains that color and brightness after receiving the signal, it belongs to the digital point-to-point display, so there is no problem caused by the CRT scanning display. If the image is blinking, etc. Support multi-screen image stitching, the screen can be displayed in full screen or split screen, and support virtual screen.

The splicing screen installation process is a complicated process, and the whole LCD splicing wall is well used thanks to a good installation method. Professional steps and professional staff can guarantee the perfect project. Attention to the details of the wiring of the LCD splicing wall system installation requires the installer not only to have professional skills, but also to be careful. The front of the LCD splicing wall is bright and clear, but the back is covered with different types of wires. The normal operation of a liquid crystal splicing wall involves computer, network, image monitoring, integrated wiring, and numerous peripheral devices that require a lot of wires behind the splicing wall. The arrangement of these wires will directly determine the playback effect of the LCD splicing wall.
1. Under normal circumstances, the survey will be conducted before the wiring, and the constructor must go to the site to conduct the survey.
2, need to communicate with the customer in detail, and do the project wiring planning, because these largely determine the length of the project, the cost control and the final effect.
3. Analysis is required after survey. Usually, the power and signal lines must be separated to avoid unnecessary interference to the signal.
4. In addition, according to the specifications of the LCD splicing wall, the position and position of the cabinet, calculate the length of the various cables required, the number of connectors and the name of the signal line.
5. Also check with the customer whether the pipeline channels available for the project meet the actual needs in order to continue the follow-up work. After the analysis is planned, the wiring can be performed.
6. When wiring the specific operation, you need to see the name of the wire to ensure that the correct jack is inserted.
7, when the line is to be fine and mentally smooth all the wires, light hands and feet. After the wire is finished, the corresponding wire is placed in the wire slot.
8. After completing all the layout of the trunking, check it again and confirm it.