The order of decoration of your own rough house! Share my little notes

Listening to the words of the ancestors, everything is pre-established, but not pre-empted.

This means that everything must be planned well before it can succeed. Not to mention the major event of decoration? Without knowing the order of house decoration in advance and making appropriate plans, it is easy to get lost in the process of decoration. If you look at the decoration regret medicine, you will know the importance of understanding the order of house decoration !

There is a legend in the decoration industry: when decorating a house, you need to choose at least 28 kinds of auxiliary materials, understand 35 basic crafts, buy 8 kinds of main materials, buy 65 pieces of furniture and accessories, go to at least 80 stores and nearly 100 It takes 100 days for a merchant PK to buy at least 200 commodities and consume 200 million brain cells to complete.

In a very human life that lasted for more than 4 months, I experienced wit and bravery with the decoration company, and the PK of various merchants one by one, and finally, turned my rough house into a home. From the ignorance of ignorance to the old driver who has already started, I think I am already qualified to share my order of decorating the house with everyone.

— The best things to determine before renovation

1. Measuring Room

Before the workers enter the construction site, take your small ruler, measure the corners of the new home in person, take the pen ruler down, mark it clearly, you must not be lazy.

The measurement content mainly includes:

â‘  Clarify the area involved in the decoration process. Especially the tile area, wall paint area, wallpaper area, floor area

â‘¡ Specify the main wall dimensions. In particular, it is necessary to design the wall size of the furniture in the future.

2. Start to explain

What is confession? To put it simply, it is the first step before signing the construction contract. The person in charge, such as the homeowner, foreman, designer, and supervisor, arrives at the site to finalize the construction plan and special design. .... I wonder if it is clear? If you have other questions, you can also ask me privately ~

PS: You have to determine the size, location, and various sizes of the large pieces of furniture. Do n’t ask me why. The socket of my house is considered to be half-waste. I didn't think about the placement of the electrical appliances in advance.

3. Determine these things

Before the official start of construction, confirm the details such as the location of the tiles and the position of painting, and do n’t forget to check the quotation and the construction schedule, because once the steps of the construction are interlocked, you need to make changes and move the whole body. Too. If you still meet the decoration company that loves to dump the pot, it can only be a misery.

— Overview of renovation steps

At this time, I have to take out my exclusive collection to show you. This is a chart summed up by the decoration master Sun Gong. The entire decoration process, I basically walked down in this way, and the practicality is very strong.

d3b1a3e3f8bba082328d64e98948fe49_hd.jpg

Note: The black characters represent the decoration steps; the blue characters represent the selection or procurement steps; the red characters represent the acceptance or settlement steps; the one-way arrow bucket represents the next step; and the two-way arrows represent synchronization.

— Start renovation, every step must go well!

· The main body is dismantled and modified to make the space more practical

When you start to dismantle the wall, build the wall, shovel the wall skin, dismantle the heating, dismantle the floor, etc., you can start to replace the security door and window at this time. If you do not change the doors and windows at this time, if you want to change the back, you will damage the wall and the floor.

This stage needs to do:

Change the anti-theft door: When you want to replace the anti-theft door, you must act at this time. When the bricklayer enters the field to work, it will fill in the irregular gaps.

Change windows: The windows need to be customized according to the size, and the customized Sundays range from 10-15 days.

Custom furniture: After the demolition project is completed, you can let the furniture manufacturer measure it. After the measurement, the drawings are determined and put into production as soon as possible, because the production cycle of custom furniture is not short.

Order sanitary ware: order toilets, water heaters and bathroom cabinets. Knowing the size of the bathroom, you can determine the bathroom cabinet first after determining the location of the bathroom cabinet. If the size you need needs to be customized, the custom cycle will also take about 30 days.

· Hydropower renovation, arrange the use of each space

Hydropower renovation is a very important hidden project, pay attention here! note! note! The sofa can be used if it is not bought well. If the water and electricity are not done well, it will affect daily life. I will talk about two parts, hydropower preparation and hydropower construction.

【Water and electricity preparation】

It stands to reason that the size of large furniture and large appliances has already been determined when designing drawings. During the hydropower transformation period, you need to go to the market to look at the cabinets and bathrooms. Anyone who needs hydropower positioning, especially those who need to install floor heating, central air conditioning, and whole house water purification, need to contact the manufacturer before the hydropower positioning. Division butt. Friends who do not need to install floor heating, central air conditioning, and whole house water purification, prepare as follows:

â‘  Cabinet measurement and drawing, the measurement part includes the location of the range hood, the location and number of hanging cabinets, and the kitchen water and electricity map is issued. If you let the carpenter or mason do it yourself, you can skip this one. My cabinet is made of bricks, and I do it myself (Ao Jiao face)

â‘¡ Confirm the size and location of the refrigerator.

â‘¢ Confirm the location of bathtub, shower room (partition), bathroom cabinet, toilet, mop pool, washing machine position, etc.

â‘£ Confirm the location and size of the water heater

【Hydropower Construction】

â‘  The first is slotting, that is, laying the pipe in the floor slab to save the increase in floor height.

â‘¡ Lay the water and electricity pipes as far as possible. It is convenient to maintain in the future. After laying, take photos and keep them away. Avoid nails or other installations on the wall and hit the water and electricity pipes.

â‘¢ Water pressure test.

After the completion of the hydropower project, the general supervisory committee will arrange the mason to enter the site, and also arrange the advanced carpentry field, and even enter the site for simultaneous construction. My suggestion is the advanced masonry site. Suspended ceiling.

· Mason

â‘  Watertight construction and acceptance of toilets, terraces, etc. The toilets need to be tested for water closure. After communicating with neighbors downstairs, there is no water leakage problem, continue to the next step.

â‘¡ If you are attaching the floor to the whole house, you need to level the ground at this time.

â‘¢ The floor drain, shower room, and partition water-retaining strip need to be pre-buried before tiling.

â‘£ When laying bricks in the living room, determine the position of the threshold stone and the door stone, and then lay the floor and wall tiles.

⑤ If you have a cast iron bathtub without skirts, it must be installed in place after the preliminary installation of water and electricity, and then closed by tilers tiling or marble.

â‘¥ Installation of threshold stone and crossing stone.

· Woodworking approach

If there is no carpentry work at home except for the ceiling, it is basically the end of the guest restaurant after the ceiling is hung. If there are large wardrobes, cabinets, and tatami mats, you need to communicate well with the carpenter, dig out the positions of switches and sockets, and reserve cabinet sinks and smoke machines.

· Painter enters the field

The painter enters the site and mainly completes the base layer treatment of the wall surface, paints the topcoat, and paints the furniture for woodworking. For students who are going to paste wallpaper, they only need to let the painter do the primary treatment on the wall where the wallpaper is planned.

As for whether to keep the top coat for the last time, personally feel that this problem is not necessary to be too real. From my experience of decoration, the significance of leaving the top coat again is not very significant. Generally, the latex paint is putty twice or three times. It should be noted that you need to wait for each pass to dry before performing the second pass.

When painting the cabinet, in fact, the uncle is suggesting that the cabinet should be painted free, and the cabinet door will be finished to the outside factory. This will reduce the use of paint and will be relatively environmentally friendly.

· Installation season

After the painter's construction is completed, the main body is basically completed and is about to enter the installation season. The specific steps are as follows:

1. Cabinet installation.

2. Installation of bathroom and kitchen ceiling, here refers to aluminum buckle ceiling.

3. Installation of kitchen appliances, inspection machines, stoves, ovens, dishwashers, etc.

4. Installation of room doors and door covers.

5. Floor laying.

6. Installation of switches, sockets and lights

7. Installation of toilet and faucet

8. Shower room installation

9. Bathroom hardware installation

10. Wallpaper laying.

11. Furniture entry

12. Curtain installation

13. Cleaning

These installation steps are not necessarily completely in order. In short, the pre-installation must be very dirty at home. For example, hardware, bathroom, etc. need to be punched to install expansion screws.

In this case, even if the order of basic house decoration is gone, the scheduling of workers and supervisors in different places is inconsistent, but almost the same.

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

Alloy Pipe & Pipe Fittings

monel400 reducer, uns n04400 reducer, monel400 con.reducer, monel400 stub end, monel 400 elbow, monel 400 cross, monel 400 tee, monel 400 red.tee, uns n04400 elbow 90DEG, uns n04400 con. reducer, uns n04400 cross, uns n04400 tee, inconel 625 pipe, monel 400 pipe, ,inconel625 reducer, inconel 625 cross, inconel625 tee, inconel 625 stub end

Inconel625 pipe,inconel625 elbow,monel 400 pipe, monel400 pipe fittings,monel400 reducer,UNS N04400 stub end

SUZHOU RSF VALVE CO.,LTD , https://www.rsf-valve.com

Posted on