The most complete decoration of the rough room in the history of the steps

Many owners are troubled by the decoration of the rough room after they have delivered the house. They do not know how to start. However, to the decoration company, it became very limited, and it simply came on its own. Then, the next small series for everyone to introduce the history of the most complete decoration of the rough room steps.

Prefabricated steps in the design of the rough room

In the preliminary design, you should make a detailed measurement of your own room. Do not be lazy. It is best to measure it yourself. The contents of the measurement mainly include: The area involved in the renovation process. In particular, tiling area, wall paint area, wallpaper area, floor area; clear main wall size. In particular, it is necessary to design the wall size of the furniture later.

Renovation of the main body of the steps to decorate the rough house

During the construction phase, the main demolition reform is one of the first projects to be carried out, mainly including the demolition of walls, walls, shovels, removal of heating, and replacement of plastic windows. When the main body is dismantled and reformed, it is to put the framework of the construction site first.

Renovation of the steps to decorate the rough house

Before the transformation of the water circuit, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition, the first measurement of cabinets should also be carried out. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions.

Mainly include: 1, to see if the position of the hood socket affect the installation of the hood; 2, see if the location of the water meter is appropriate; 3, to see if the position of the inlet is convenient to install the sink. For the first measurement of the cabinet, it can be completely done by itself. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof.

Prior to the start of renovation, the arrival time of main materials, such as tiles and large core boards, should be after the hydropower reform. Because the circuit modification involves ground slotting, if tiles or large core boards are improperly positioned, it is troublesome for workers to move in and out.

Carpenter at the steps of decorating rough house

Carpenters, bricklayers, and oil workers are the “three brothers” in the construction process. The basic order of appearance is: tile-wood-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement.

In fact, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered in a sense as a detailed link of the main demolition and reform. They themselves do not conflict with the transformation of water circuits, and sometimes they still need some. Cooperate.

Steps to decorate the rough house

If the workers are too busy, the foreman will normally allow the “wooden cock” to enter the court when the “tile boss” is not over. This is normal because there is no conflict between the two. In the process of tile work, it also involves the following three aspects of the installation: 1, through the door stone, marble windowsill installation. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now. 2, the installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. It should be early to buy a floor drain. 3, hood installation. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood. The bricklayers leave the floor. At this time, the cabinet can be measured for the second time. Accurately, after the wall tiles have been attached and the hood is installed, the cabinet can be measured for the second time.

Brushing wall paint for decoration of rough room

Oilworkers entered the field and mainly completed the work of basic wall surface treatment, brushing of topcoats, and painting wood furniture. To prepare a wallpaper, you only need to let the oilworker do the grass-roots work on the walls of the wallpaper. As to whether or not to leave the last time to finish the paint, personally feel that this problem is not necessarily too true, my experience of decoration, the significance of leaving paint again is not great, because the back of the operation is no more dirty than the paint.

The general understanding of the decoration is only the decoration of the "construction part", in fact, the decoration of the "installation link" is also the focus of decoration. If the "design link" is to "conceive" the look of our future home, then the "construction link" is to "package" our home, and really say that "home-made" homes are almost all in the "installation phase."

The kitchen and bathroom ceiling of the steps of decorating the rough house

Cupboard ceiling as the installation of the first team, or in the continuation of the home "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave the heads and openings.

I believe that the professional construction, believe that the manufacturers of the installation level, believe that the product line of production operations, mostly compared to the decoration of the team of workers slightly better. Decoration is like a game. The bet is the craft of the workers. In fact, each part of the decoration is very independent, accurately grasp the choice of materials, master some simple construction process, handle the relationship between workers, etc. This is the key. Decoration, quality is always ranked first, is the main contradiction, is the principle.

Kitchen Cabinet Installation Steps

After the ceiling is over, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.

Blank House Blank Room Renovation Costs Blank House Renovation Budget Renovation Steps Renovation House Steps

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Led Emergency Downlight

Naips LED Emergency Down Light is specially designed for ceiling recessed emergency lighting. Automatically light at once when buildings main power outage. NON-MAINTAINED type and it can customized the emergency time for different wattage. We can also add the LED emergency driver kits to match different kinds of your LED downlights.

Led Downlight With Emergency Backup,Downlight With Emergency Backup,Emergency Light Downlight,Led Emergency Downlight

Foshan Nai An Lighting Electric Co.,ltd , https://www.ledpowerpack.com

Posted on