1. Acceptance of woodworking
The acceptance of woodworking is mainly reflected in:
(1) Whether the structure is straight. Whether horizontal or vertical, the correct carpentry practices should be straight.
(2) Is the corner accurate? The normal corners are all 90 degrees, except for special design factors.
(3) Whether the spelling is strict and accurate. The correct wooden pattern is to be seamless or to maintain a uniform distance.
(4) Whether the radian and roundness are smooth and sleek. In addition to a single, a number of the same shape but also to ensure that the same shape (5) cabinet door switch is normal. When the door is open, it should be light and no noise.
(6) There should be no gaps in the fixed wall of the cabinet.
(7) Whether or not the woodworking project is broken. It should ensure that the surface of the woodworking project is flat and there is no drum or breakage.
(8) Symmetrical carpentry items are symmetrical.
(9) There is no repair in the decorative panel nails. Of course, this is the painter's job, but because of its presence in the woodworking project, it is mentioned here.
(10) Whether the connection of the ceiling angle line is smooth and whether there is any obvious unevenness or deformation.
(11) Whether the skirting line is straight and accurate on the ground.
(12) Whether the ceilings of toilets and kitchens, such as aluminum gussets and PVC gussets, are flat and have no deformation.
(13) Whether the cabinet door handle lock is installed correctly and normally open.
(14) Is the bedroom door and other doors open? When closed, the upper, left and right door joints should be tight, and the lower door gap should be moderate, generally 0.5 cm.
2. Acceptance of paint (1) Whether the surface of the furniture oil is saturated or not. It should be ensured that there is no foaming or cracks, and the thickness of the paint should be uniform and consistent in color.
(2) Whether the surface of the furniture varnish has the same thickness, the paint surface is saturated, clean and free from particles.
(3) Whether the emulsion paint on the wall surface is flat and reflective, there is no emptying, blistering, cracking phenomenon.
(4) Wood and plasterboard ceiling paints are generally latex paints and should have a smooth surface with no cracks at the board joints.
(5) Whether the connection of the ceiling angle line is smooth, there is no obvious wrong and distortion.
(6) The wallpaper patchwork is inaccurate and does not tear. Patterned texture patches should be accurate and error-free.
(7) Whether there is no pollution on the wall surface, no stain exists.
3, Mason acceptance (1) whether the brick surface is flat, no tilt phenomenon.
(2) Whether the gaps in the brick surface are regular and uniform.
(3) Whether the toilets, balconies and kitchen floor tiles with floor drain have sufficient self-drainage inclination.
(4) Whether the brick surface is broken and collapsed.
(5) The tile orientation is correct and there is no reversal.
(6) Whether the tile and waistline position is correct, there is no biased position or the height is wrong.
4. Acceptance of metal engineering (1) Whether the metal body structure is straight; if the form part, it is required that the closure such as a strip of glue be completed.
(2) Whether the metal form is flexible and has no obstacles.
(3) Whether the pipe joints of anti-theft nets, security doors, etc. have been polished, have a stable placement, and have not loosened.
(4) Whether the specifications and wall thickness meet the requirements.
(5) There is no leakage of rain between the window and the window.
5. Acceptance of miscellaneous items (1) In accordance with the provisions of the contract item, whether or not the project items have been completed shall be checked item by item.
(2) Whether the lamps are all on.
(3) Whether the engineering waste has been completely cleared.
(4) Whether the sanitary fixtures and other installations are installed correctly, whether the toilets include water storage and flushing, and whether the basin drainage is normal.
(5) There is no blockage in the floor drain.
The acceptance of woodworking is mainly reflected in:
(1) Whether the structure is straight. Whether horizontal or vertical, the correct carpentry practices should be straight.
(2) Is the corner accurate? The normal corners are all 90 degrees, except for special design factors.
(3) Whether the spelling is strict and accurate. The correct wooden pattern is to be seamless or to maintain a uniform distance.
(4) Whether the radian and roundness are smooth and sleek. In addition to a single, a number of the same shape but also to ensure that the same shape (5) cabinet door switch is normal. When the door is open, it should be light and no noise.
(6) There should be no gaps in the fixed wall of the cabinet.
(7) Whether or not the woodworking project is broken. It should ensure that the surface of the woodworking project is flat and there is no drum or breakage.
(8) Symmetrical carpentry items are symmetrical.
(9) There is no repair in the decorative panel nails. Of course, this is the painter's job, but because of its presence in the woodworking project, it is mentioned here.
(10) Whether the connection of the ceiling angle line is smooth and whether there is any obvious unevenness or deformation.
(11) Whether the skirting line is straight and accurate on the ground.
(12) Whether the ceilings of toilets and kitchens, such as aluminum gussets and PVC gussets, are flat and have no deformation.
(13) Whether the cabinet door handle lock is installed correctly and normally open.
(14) Is the bedroom door and other doors open? When closed, the upper, left and right door joints should be tight, and the lower door gap should be moderate, generally 0.5 cm.
2. Acceptance of paint (1) Whether the surface of the furniture oil is saturated or not. It should be ensured that there is no foaming or cracks, and the thickness of the paint should be uniform and consistent in color.
(2) Whether the surface of the furniture varnish has the same thickness, the paint surface is saturated, clean and free from particles.
(3) Whether the emulsion paint on the wall surface is flat and reflective, there is no emptying, blistering, cracking phenomenon.
(4) Wood and plasterboard ceiling paints are generally latex paints and should have a smooth surface with no cracks at the board joints.
(5) Whether the connection of the ceiling angle line is smooth, there is no obvious wrong and distortion.
(6) The wallpaper patchwork is inaccurate and does not tear. Patterned texture patches should be accurate and error-free.
(7) Whether there is no pollution on the wall surface, no stain exists.
3, Mason acceptance (1) whether the brick surface is flat, no tilt phenomenon.
(2) Whether the gaps in the brick surface are regular and uniform.
(3) Whether the toilets, balconies and kitchen floor tiles with floor drain have sufficient self-drainage inclination.
(4) Whether the brick surface is broken and collapsed.
(5) The tile orientation is correct and there is no reversal.
(6) Whether the tile and waistline position is correct, there is no biased position or the height is wrong.
4. Acceptance of metal engineering (1) Whether the metal body structure is straight; if the form part, it is required that the closure such as a strip of glue be completed.
(2) Whether the metal form is flexible and has no obstacles.
(3) Whether the pipe joints of anti-theft nets, security doors, etc. have been polished, have a stable placement, and have not loosened.
(4) Whether the specifications and wall thickness meet the requirements.
(5) There is no leakage of rain between the window and the window.
5. Acceptance of miscellaneous items (1) In accordance with the provisions of the contract item, whether or not the project items have been completed shall be checked item by item.
(2) Whether the lamps are all on.
(3) Whether the engineering waste has been completely cleared.
(4) Whether the sanitary fixtures and other installations are installed correctly, whether the toilets include water storage and flushing, and whether the basin drainage is normal.
(5) There is no blockage in the floor drain.
Three trees Lacquer paint Lacquer paint Furniture Toilets Kitchen cabinets Bedroom lamps Tiles Tiles Tiles Kitchen tiles Tiles Balcony tiles Bedroom lamps
Stainless Steel Welded Square Tube
Stainless Steel Welded Square Tube,Round Stainless Steel Welded Tube,Welded Square Tube,Stainless Steel Welded Steel Tube
Foshan Maysky Stainless Steel Co., Limited , https://www.mayskysteel.com