Warm installation is relatively more in the north, and it is also necessary to pay attention to the details in the installation. If you do not understand well in advance, you do not know how to defraud construction personnel. The following Xiao Bian came to introduce you to what you need to pay attention to when you warm up and fill in the bricks for a few days .
A few days after floor heating can be paved
A few days after floor heating can be paved , in general, as long as there are five days, but also to do from time to time to sprinkle water and close the doors and windows, the purpose of doing so is conducive to the strength of the cushion.
Installed floor heating need to pay attention to what aspects
1, should pay attention to warm the installation of the supervisor
The main floor heating pipe is an important equipment for conveying water to the floor heating system. The installation of the main heating pipe affects the operation of the entire heating system. Therefore, when installing, it is necessary to pay attention to the construction indicated in the design drawings. This kind of error phenomenon occurs. The supervisor's insulation work needs to be done well, and it must be horizontal and vertical, so that the tube card can be fixed firmly and the pressure test can be done after the installation is completed.
2, should pay attention to the installation of the water separator
The water collector is the heart of the floor heating system. At the same time, it is also used to evenly distribute and recover the water for each of the ground heating branches so as to achieve a good system circulation. Therefore, during the installation, this installation is also required to maintain the level of the situation, pay attention to the return of water needs to be connected. After completion, remember to wipe clean, and to indicate the heating area of ​​each circuit, this is also convenient for future maintenance and so on.
3, should pay attention to pipe laying
In the construction of floor heating, the laying of the floor heating pipe is the most important thing. Therefore, the laying of the floor heating pipe will directly affect the heating effect of the floor heating system. If it is installed, the local temperature will be more comfortable and will not appear. Too cold or too hot. It should be noted that in line with the design of the circuit, the actual laying gap between pipe loops is greater than 30 meters, and at the same time, the pipeline cannot be crossed.
4, should pay attention to the laying of the backfill
The warming up was once a heat storage layer. This must also be done. However, it must be noted that the pressure of the fine stone concrete protective layer must be measured before it is laid. If the pressure of the pressure gauge is lower than 4 MPA, it cannot be constructed. In addition, the concrete cannot be mixed on the floor heating pipe, and at the same time, it should be noted that the floor heating pipe cannot be exposed. The level of the ground after the concrete is leveled is almost more than 5mm. When laying concrete, marks must be made in such places as entrances, aisles, and floor drains, so as to prevent misconduct in the later construction from damaging the pipeline.
Summary: On the floor after a few days of backfilling, it is necessary to pay attention to what related content is introduced into this, and when shop floor is warm, we must pay attention to details. It is also a hidden project. If it is not paved, it will cause trouble later in the process. It is also quite a lot, so before you lay it, you have to understand some knowledge in advance, which is also helpful to you.